Skip to content

Tech Quick Reference (FOH · Monitors · Media · Lights · Stream · Stage)

Owner: Tech Lead

📄 Download the two-page PDF — rebuilt automatically on every change.

Two pages for everyone behind a console, a deck, or a cable. Every line points into the skeleton; if this sheet and the linked page disagree, the linked page wins. Your church’s clocks, rooms, and boot order: Our Congregation.

Why tech exists

Technology succeeds when nobody talks about it afterward — except to say they could hear and see clearly enough to sing (Tech Overview). Priorities, in order: 1 Safety · 2 Intelligibility (spoken word + lead vocal) · 3 Stability · 4 Beauty · 5 Experimentation — never at the cost of 1–3 on Sunday.

Minimum viable Sunday

Seat Sunday is OK when
FOH Pastor’s mic works; lead vocal clear at the back; nothing hurts; hands off at freeze
Monitors Everyone hears click (if used), lead vocal, themselves; nobody shouts for a mix mid-song
Media Right words on the house screens on time; confidence shows lyrics + section cues; safe slide known
Lights People visible (and on camera); no strobes; prayer and word are calm; blackout and restore known
Stream Audio healthy; live at the agreed time; fallback known
Stage Nothing to trip on; spare mic / cable / DI where the plot says; inputs match the list

One tech, several hats — boot order: power (amps last) → show file / deck → wireless & batteries → line check (pastor mic first) → house + confidence up and routed → spare vocal path → freeze at doors.

Non-negotiables

Rule Means Source
Prior rehearsal — same bar as band Scheduled tech attends the midweek rehearsal tied to the service; no rehearsal → default do not serve; exceptions granted in advance by the Director, Worship Lead, or Tech Lead with a qualified cover Rehearsal Standards
Rehearse the way we serve House/overhead and confidence monitors run at midweek; stream optional unless training or broadcast-critical Lyrics & Stage Displays
Ready, not present Show file/deck live, outputs verified — that is “ready” (= call time) Definitions
Freeze Default: doors (or T−10); the Worship Lead or Tech Lead calls it once on talkback. No new patches, routing, or console changes unless safety/failure. Monitor freeze after the final run Pre-Service Rehearsal
Routing is verified every service Confidence-only content never lands on house; house / confidence / stream are three intentional outputs Lyrics & Stage Displays
Show files are predictable Golden template per room; YYYY-MM-DD_Service_Descriptor; never overwrite golden without a note Show File Standards
Hearing is people-safety Anyone reports pain → turn down first, then tell the Tech Lead; hearing protection in a known place Tech Overview

The week, from the booth

When What happens Tech
Set confirmed Song Selector proposes, Director confirms; Worship Lead publishes keys/forms/charts; Selector flags new, track-heavy, or production-special songs Tech Lead scans for unusual needs; show files and decks staged
Midweek T−0:15 Tech open / line check; house + confidence up FOH/Monitors: gains, talkback, RF, click; Media: deck to plan, both outputs routed
Rehearsal (90 min min.) Review → warm-up → every part → every transition → 20-min full run Stabilize gains early; run slides for real; confirm confidence readable from stage; capture fixes with owners
Before Sunday Amendments land Deck / cue / input-list fixes done; merge intentional improvements to golden
Sunday pre-service Line check → confidence glance → 1–2 problem spots → opener + one transition → freeze → prayer Present → ready for run-through → service-ready by the local clock
Service · strike Quiet professionalism; people first, then process Minimal kind in-ear chatter; save intentional changes with a date note; packs charging; issues logged

Role by role

Seat Midweek must Pre-service must During
FOH Build the mix against the real band; talk sparse vs full with the Worship Lead Power in order; correct show file; line check, labels, phantom only where needed; pastor mic + spare handheld live; walk the room Spoken word → lead vocal → groove → the rest; don’t chase every peak; hands off at freeze
Monitors Build stable mixes early; discourage rebuilds Packs labeled, RF coordinated, click metered; pack-death default agreed (spare → wedge → room) Requests through the cue workflow; “more me” over louder wedges; monitor freeze after final run
Media Deck matches order and sung forms; house advancing; confidence readable; note fixes Spelling/theology lines checked; 2–4 lines per slide, phrase breaks, contrast; spontaneous folder; backup; outputs isolated Eyes on the Platform lead; next slide armed; lost → safe slide, never random verses
Lights Run key cues against the set when cue-heavy Patch OK; cue stack matches plan; blackout / restore known Invited-to-sing bright; prayer / word = static warm wash; no strobes
Stream Lock routing, lower-thirds, handoffs (full encode optional) Destination right; meters healthy; recording if required; fallback known Chat moderation is a separate role; no routing experiments after doors
Stage Plot matches who is playing; labels match the input list Pathways clear; spare SM58 / cable / DI in the known place; hazards gone Quiet mic handoffs; watch the Platform lead; strike and reset

When something breaks

People safety first; preserve the moment second; one message on the day-of channel. Someone collapses → stop the music, mute open mics, lights up, ushers / emergency services; any lead may call it. (Incidents & Contingencies)

Failure Do Owner
Lead vocal or pastor mic dies Spare handheld at once; FOH prioritizes the spoken word Stage + FOH
Click / tracks die Worship Lead counts in; live arrangement Worship Lead + playback owner
Lyrics freeze Holding slide; lead carries; switch to or reboot backup Media
IEM pack dies Spare pack → nearest wedge → play on the room; tell the Worship Lead once Monitors / Stage
Feedback howl Pull the offending fader, not the master; find the open mic FOH
Stream drop · power blip Room continues; restart encoder when safe · wait for power to settle, amps up last Stream · Tech Lead

Afterward: care for people, then a short factual note — Incident Log (no protection matters, no minors’ names). Broken gear → Gear Issue Ticket.

Scheduling, communication, who to ask

Schedule requests answered within 48 h, swaps within 24 h; availability covers rehearsal and service — can’t make rehearsal → don’t accept the slot unless an exception is already granted. You find a qualified cover who takes rehearsal and service; final when both people and the swap confirmer (Director or Tech Lead) agree; <24 h → phone. Escalation: section lead → Tech Lead → Director → pastor; safety and care issues skip the chain (Availability & Swaps · Scope & Authority).

Where to look

Need Page
Everything tech Playbook · Roles · Rehearsal Standards · Midweek Rehearsal Runbook · Tech (checklists, displays) · Equipment · Tools & Systems · Glossary
https://theonize.github.io/petra/12-quick-reference/tech-quick-reference/
QR for this page